Video
Digital Supply Chain
Installation of two 2,700t arcs for the Toruń Bridge, Poland
By Bizclik Editor
May 19, 2020
undefined mins
Share
ALE was contracted to complete the skidding, assembly and float installation of two 2,700t arches over the 500m wide river Vista, in Toruń which will become a traffic bridge and is a major investment in the region. Case study http://www.ale-heavylift.com/case-study/installation-two-2700t-bridge-arches-torun-poland/
Share
Featured Videos
View all