May 19, 2020

Installation of two 2,700t arcs for the Toruń Bridge, Poland

Installation of two 2,700t arcs for the Toruń Bridge, Poland
video system solution
Bizclik Editor

ALE was contracted to complete the skidding, assembly and float installation of two 2,700t arches over the 500m wide river Vista, in Toruń which will become a traffic bridge and is a major investment in the region. Case study http://www.ale-heavylift.com/case-study/installation-two-2700t-bridge-arches-torun-poland/

Share article